The 70,000m2 structure, built on the site of the international terminal’s old main carpark, includes new pick-up/drop-off areas, undercover parking, public transport links, and new road layouts, and is designed for 650 vehicles per hour at peak times.
The 70,000m2 structure, built on the site of the international terminal’s old main carpark, includes new pick-up/drop-off areas, undercover parking, public transport links, and new road layouts, and is designed for 650 vehicles per hour at peak times.