Valley Water reached a milestone in the summer of 2024 when construction crews completed the final stretch of a 1,736-foot-long tunnel next to Anderson Dam. Construction crews used a specialized Micro-tunnel Boring Machine to tunnel the final 347 feet, driving 30 feet below the water’s surface. Once the machine drove through the last piece of […]